Bridge Replacement: Clinch Crescent

Location:
St. John's, NL
Year:
2005
Description:
SDI Engineering was responsible for the design of a precast girder bridge deck system. This system utilized 17 precast prestressed concrete girdered that are tied together using shear keys and transverse post tensioning. This new system was developed in conjunction with Capital Precast Ltd. The concept is based loosly on the Bulb Tee Girder system used throughout much of the Northwestern U.S.

UPDATE: Construction has begun on this project. Check back here for construction pictures as they arrive. Clinch Crescent Bridge Replacement: Precast Girders Clinch Crescent Bridge Replacement Clinch Crescent Bridge Replacement: Post Tension Cables Clinch Crescent Bridge Replacement: Placing Girders Clinch Crescent Bridge Replacement: Feeding Post Tension Cables Clinch Crescent Bridge Replacement: Deck Clinch Crescent Bridge Replacement: Prestress Cables Clinch Crescent Bridge Replacement: Top Flange Reinforcement Clinch Crescent Bridge Replacement: Lifting Cables Clinch Crescent Bridge Replacement: Finished Girders